Ultra long duration energy storage project development studies Innovate UK Business Connect

Ultra long duration energy storage project development studies Innovate UK Business Connect

This is to ensure that your project is able to inform your application to a Phase 2 competition. A first draft of your project development study must be completed by 31 May 2027. This Phase 1 competition is providing funding for project development studies (formally classified as feasibility studies) to strengthen demonstration project proposals under the planned future Phase 2 competition. You do not need to provide LCOS or net present value (NPV) calculations as part of your application. Stream 2 aims to develop early stage electrochemical ULDES technologies that have the potential to achieve installed system costs of US$15/kWh or less, by 2035. Stream 1 aims to develop and demonstrate near commercial electrochemical ULDES systems that have the potential to achieve installed system costs of $40/kWh or less, by 2030.

Further information about the Subsidy requirements can be found within the a closer look at technologies addressing energy use Subsidy Control Act 2022. This competition provides funding to enterprises using the Research, Development and Innovation Streamlined Subsidy Scheme. You cannot use a previously submitted application to apply for this competition. Innovate UK expects and supports the provision and safeguarding of welfare standards for animals used in research and innovation, according to best practice and up to date guidance. Your project can include organisations who do not claim any funding for their work on the project. More information on the different types of organisation can be found in our Funding rules.

UK registered businesses can apply for a share of up to £3 million for project development studies to support the development of ultra long duration batteries and battery energy storage demonstrators in the UK. ESA will be actively participating throughout the event, contributing to a range of panel discussions and roundtable sessions that address the key opportunities and challenges facing the industry. The session will explore how onsite generation and storage can help organisations improve resilience and reduce operating costs as they electrify. The programme covers the commercial realities of electrification alongside practical approaches to optimising energy and transforming operations. The Information Commissioner’s Office also has a useful guide for organisations, which outlines the data protection principles. Innovate UK and UKRI are directly accountable to you for their holding and processing of your information, including any personal data and confidential information.

In applying to this competition, you are entering into a competitive process. The award of funding for the project development study under this Phase 1 will not be a condition of eligibility for Phase 2. “It will allow us to extract the full benefit from our home-grown renewable energy sources, drive down costs and end our reliance on volatile and expensive fossil fuels.

Your project development study must include a deployment plan that demonstrates your ability to complete a demonstration project under Phase 2 by 2030. Your project development study must include an engineering design for implementation of a demonstration project. Your choice of proposed site will be considered in the context of the maturity and scale of your technology. Your project under Phase 1 must show a clear route to construction and operation in the UK, with a specific site identified as part of the project development study.

Bringing together industry leaders, policymakers, developers, investors and technology providers, the summit will explore the latest market developments, policy updates, investment opportunities and technological innovations shaping the energy storage sector. Taking place on 30 November 2026 in Westminster, the summit will explore key themes including energy security, affordability, sustainability, clean energy innovation and the role of AI in accelerating the energy transition. Map of energy storage facilities in the UK, with information provided by research organisations and from the Department for Business, Energy and Industrial Strategy (BEIS).

The potential role for system-level large-scale electrical energy storage is likely to grow, in centralised facilities and aggregated across distributed locations. However, it will be crucial to take an integrated approach that considers both the energy service demands for power, heat and transport, and the policy and market framework in which they sit. One project will investigate the potential for storing electricity via Compressed Air in Thermal Generation’s mothballed gas storage cavities in Cheshire, with R&D UK Centre working alongside EDF UK’s Thermal Generation, IO Consulting and Hydrostor. The four long-duration energy storage (LDES) demonstration projects will help to achieve the UK’s plan for net zero by balancing the intermittency of renewable energy, creating more options for sustainable, low-cost energy storage in the UK. If you need more information about how to apply, please read our funding support pages.

By maximising generation through battery storage, we minimise curtailment and enable industrial offtake that can achieve higher decarbonisation, creating new markets for tidal energy and providing valuable services like grid balancing. “We are delighted to have supported EMEC in the delivery of this world first project, integrating our Scottish-made battery technology into cutting edge applications which could form a key part of our future grid networks not only in the UK but globally.” “This unique project showcases the strengths of our vanadium flow battery technology as a high-cycling, non-degrading and fundamentally safe form of long-duration energy storage. The trial also highlights an alternative pathway for tidal energy in scenarios where grid export capacity is limited, a likely feature in the future as we transition to a fully renewable energy system. We represent the critical role of energy storage to support the cost-effective transition to a resilient and secure clean energy system.